Starting a tedious work order right now
Time is 10.30 am, Wednesday 26th February.
I am cutting 50mm Bisalloy 500 steel plate.
The work order is for 7 x 3 metres x 120 mm steel bars. Each bar will take 25 minutes to cut.
A total of 3 hours. All I need to do now, is stand here and make sure nothing goes wrong.
Must stop myself from falling asleep. 🥱
I am cutting 50mm Bisalloy 500 steel plate.
The work order is for 7 x 3 metres x 120 mm steel bars. Each bar will take 25 minutes to cut.
A total of 3 hours. All I need to do now, is stand here and make sure nothing goes wrong.
Must stop myself from falling asleep. 🥱