Random
Only logged in members can reply and interact with the post.
Join SimilarWorlds for FREE »

Starting a tedious work order right now

Time is 10.30 am, Wednesday 26th February.
I am cutting 50mm Bisalloy 500 steel plate.
The work order is for 7 x 3 metres x 120 mm steel bars. Each bar will take 25 minutes to cut.


A total of 3 hours. All I need to do now, is stand here and make sure nothing goes wrong.
Must stop myself from falling asleep. 🥱
This page is a permanent link to the reply below and its nested replies. See all post replies »
ShenaniganFoodie · 36-40, M
Plasma cutter =