Starting a tedious work order right now

Time is 10.30 am, Wednesday 26th February.
I am cutting 50mm Bisalloy 500 steel plate.
The work order is for 7 x 3 metres x 120 mm steel bars. Each bar will take 25 minutes to cut.


A total of 3 hours. All I need to do now, is stand here and make sure nothing goes wrong.
Must stop myself from falling asleep. 🥱
This page is a permanent link to the reply below and its nested replies. See all post replies »
scorpiolovedeep · 51-55, M
Hot works permit ??

Double eye protection?
Have you signed the pre start?
SWMS ?

🙂
Gusman · 61-69, M
@scorpiolovedeep No hot work permit required.
Appropriate eye protection always worn
Pre-start is always signed before commencement.
SWMS - Correct procedures are always adhered to. 🙂
scorpiolovedeep · 51-55, M
Good work !!

We require hot works permit for the shift.
Crews are cutting pile liners on site. 🙂


@Gusman