Positive
Only logged in members can reply and interact with the post.
Join SimilarWorlds for FREE »

2 days of work

Last 2 days...carpet out...new floor in
This page is a permanent link to the reply below and its nested replies. See all post replies »
turbineman40 · 80-89, M
Good looking floor
PTCdresser57 · 61-69, M
Ty turbineman40
turbineman40 · 80-89, M
@PTCdresser57 thats a lot of time on your knees installing a floor
PTCdresser57 · 61-69, M
Yes it was turbineman40...hurt for days
turbineman40 · 80-89, M
@PTCdresser57I have installed a couple of floors and I can't do it again. My knees hurt for a week or mire each time
PTCdresser57 · 61-69, M
I also did my 2 bathrooms turbineman40
turbineman40 · 80-89, M
@PTCdresser57 Looks like you took the time and made the floor tight together. Good for you. It does look great
PTCdresser57 · 61-69, M
Thanks...I bought all the tools to do that turbineman40
turbineman40 · 80-89, M
@PTCdresser57 I am impressed! You did well
PTCdresser57 · 61-69, M
Thanks turbineman40...a neighbor has expressed interest in me doing a floor in his basement for him.
turbineman40 · 80-89, M
@PTCdresser57 ask him, your neighbor, to go for a time and materials type payment job and not just a lump sum. To protect yourself, if the job has problems. Especially rotten wood under layment and possible rotten framing under the floor.

Get a contract in writing with both of one sign!! No hand shacks or verbal agreements
PTCdresser57 · 61-69, M
It would go on a cement floor turbineman40. I have done some other work for him before. That is the agreement...he pays for all materials...then I charge him for my time.
This comment is hidden. Show Comment
PTCdresser57 · 61-69, M
Thank you...good suggestion turbineman40